The CHP plant is housed in
a purpose built building
adjacent to the existing boiler
house on site.
The facility consists of one
5MW CENTRAX KB7 gas turbine
generating set along with one
28 tonnes/hr supplementary
fired waste heat boiler operating
at 13 Bar.
The system is designed to
operate on natural gas fuel.

The CHP facility supplies the
majority of the site steam and
electricity requirements while guaranteeing
energy cost savings and reliability to the host site.
The system incorporates state of the art control
technology and automation software.
A site specific SCADA system monitors an
extensive range of plant parameters with
SMS text alerts for alarm notification.