Vapour Recovery Unit Installation Co. Dublin, Cork & Galway, Ireland

Fingleton White were appointed by Irish Shell as the Engineer and Project Manager for the installation of vapour recovery units at their Dublin, Cork and Galway terminals. This included the design, material procurement, planning, construction supervision and commissioning of all sites. The vapour recovery units were installed as per SI No. 374 of 1997. The Vapour Recovery [...]

Authorised Distributor Depot Redevelopment, Newbridge, Co. Kildare, Ireland

Fingleton White were appointed by Irish Shell as the Engineer and Project Manager for the redevelopment of the authorised distributor depot at Capital Oil, Newbridge. This included the design, material procurement, planning, construction supervision and commissioning of the site. The existing depot was decommissioned, all hazardous wastes were removed by a licensed contractor, eg oil sludge, contaminated [...]

Wind Power Installation Munster Joinery Ballydesmond, Co. Cork, Ireland.

As part of the ongoing engineering and environmental consultancy agreement with Munster Joinery, Fingleton White were appointed to oversee the technical and commercial integration of 2 X 2 MW wind turbines into the existing Ballydesmond manufacturing and onsite generation infrastructure. The Fingleton White site team was designated to liaise with, and represent the interests of the manufacturing [...]

Hydroelectric Power Station Co. Wicklow, Ireland

Dublin City Council awarded the project management of a small hydro project to Fingleton White in December 2003. The project is located at the Vartry Water Treatment works in Roundwood, Co. Wicklow. Due to the elevation difference between the Lower Vartry Reservoir and the waterworks, a water turbine was installed to recover some of the energy that [...]

Combined Heat and Power Plant, Munster Joinery, Co. Cork, Ireland

The Combined Heat and Power Plant (CHP) consists of a wood burning furnace, boiler and steam turbine. The process involves burning the wood chips and saw dust to produce a high temperature exhaust, which in turn is passed through the waste heat boiler to produce steam. The installation consists of 1no 12.0MW (15t/ hr) boiler, 1no 3.0 [...]