10 MW Gas Fired CHP
Areas of work: Food Processing, Power Generation
Description
The installation consists of a 4.8 MW gas turbine and a 23 t/hr boiler commissioned in 1997 and a 5.2 MW gas turbine and a 27 t/hr boiler commissioned in 1999. The project also involved the design and construction of a 1 km, 19 bar gas line and pressure reduction facility as well as a 10 kV power supply with all necessary protection equipment.
The energy centre provides over 85% of power requirements while guaranteeing energy cost savings and reliability to the host site.
Condition assessments are carried out every 5 years and detail investment requirements in terms of specific criteria such as; reliability, safety and energy efficiency savings
Regular meetings and reports along with real time access to the plant outputs are the foundation for a successful client relationship
Project Elements:
- Operation and Management
Continuous Improvement - EPA compliance reporting