180 MWh BESS

Areas of work: Battery Storage, Renewable Power

Description

Review of the technical and safety information to inform the BESS evaluation report.

Developed an outline emergency response plan, setting out the appropriate response should various emergencies take place on the BESS site.

Developed calculations and drawings showing theorical overpressure wave and toxic plume generated by a BESS failure in compliance with HSENI technical note on BESS.

Project Elements

  • Provided input into the BESS site design
  • Provided technical support throughout the planning process
  • Compliance to industry guidance and standards

Back to projects

Services Provided

  • Engagement with planning authority and HSENI
  • Develop BESS Evaluation Report
  • Develop Outline Emergency Response Plan
  • Calculation of and drawing showing theorical Overpressure Wave and Toxic Plume generated by a BESS failure.