Echelon AGI

Areas of work: Gas Infrastructure

Description

An 85 barg 200NB pipeline was required to supply gas from an existing transmission pipeline to a new above ground installation (AGI) to feed a new customer on the gas network in Ireland. The pipeline was routed through an urban area and crossed below the grand canal via trenchless crossing.

Project Elements

  • 1.5km 200 NB diameter pipeline 
  • Hot tap from existing 450 NB mains 
  • Trenchless Crossing below the Grand Canal via micro tunneling
  • Above ground installation- Filter & metering skid  

Back to projects

Services Provided: