Kiltotan AGI and Pipeline

Areas of work: Gas Infrastructure

Description

A new 1000MW transmission gas connection was required to supply a new peaking power station.  The project required a live connection onto the existing gas transmission main, routing of 6km of DN250 pipeline cross country, and installation of a new Above Ground Installation (AGI) at the customer site. The pipeline required CRU section 39A consent and associated Environmental Impact Assessment.

Project Elements

  • Offtake compound
  • Live hot tap connection
  • 6km DN250 pipeline
  • Special crossings (road/river)
  • Above ground installation – metering & 85-30 Barg pressure reduction

Back to projects
Services Provided
  • Project management
  • Pipeline route selection
  • Preliminary & detailed design
  • Material specification & procurement management
  • Stress analysis
  • CRU Section 39A consent application
  • Planning permission application
  • Construction supervision
  • PSDP