AGI 40% Capacity Increase

Areas of work: Gas Infrastructure

Description

A Conceptual Design Study assessed the ability of the AGI to have the throughput capacity increased by circa 40% to meet the predicted demand requirements.

The study considered the viability of utilising the land to locate a biodiversity area and solar arrays, as opposed to only renting this land and handing back to the landowner.

Project Elements

  • Site Design
  • Renewable Power Supply
  • Biodiversity
  • Code Compliance

Back to projects

Services Provided

  • Site surveys
  • Conceptual Design deliverables and requirements stated within GD/SP/TR/23
  • Mechanical, Civil, Electrical & Instrumentation and Cathodic Protection
  • HAZID 2 Study
  • Interfacing with the Client’s representatives
  • Risk Assessments and Method Statements