AGI 40% Capacity Increase
Areas of work: Gas Infrastructure
Description
A Conceptual Design Study assessed the ability of the AGI to have the throughput capacity increased by circa 40% to meet the predicted demand requirements.
The study considered the viability of utilising the land to locate a biodiversity area and solar arrays, as opposed to only renting this land and handing back to the landowner.
Project Elements
- Site Design
- Renewable Power Supply
- Biodiversity
- Code Compliance