Wastewater Treatment Plant
Areas of work: Water

Description
Our Client, an international beverage manufacturer, was looking to expand one of its production facilities. The existing Wastewater Treatment Plant was already underperforming with various process-related issues. As a result, there were capacity limitations while meeting the existing discharge limits.
Following completion, WEW Engineering successfully optimised the Plant. It is now meeting the new capacity requirements, while obtaining the more onerous discharge Licence Limits. The plant is now running more efficiently and more economically, as the plant is less costly to run in terms of energy and operational costs.
Project Elements:
- New Balance Tank
- New High-Level pH correction system
- Revised Aeration System operation
- New Chemical DAF unit with coagulant dosing, polymer dosing, and flocculation
- Sludge tank and pumps
- PLC/SCADA upgrade
- A backup MBR System