70 MWh BESS
Areas of work: Battery Storage, Renewable Power
Description
Review of the technical and safety information from battery supplier, development of BESS evaluation report which centralised all control, safety, and fire suppression features of the BESS into one report structured around addressing the concerns of the Planning authorities, Fire and rescue services and the HESNI. This report also evaluation the BESS compliance with NFPA 855.
Developed calculations and drawings showing theorical overpressure wave and toxic plume generated by a BESS failure in compliance with HSENI technical note on BESS.
Modelled lighting requirements for BESS site to ensure adequate light on site to comply with statutory guidance.
Project Elements
- Provided input into the BESS site design
- Provided technical support throughout the planning process
- Compliance to industry guidance and standards