Boiler Replacement

Areas of work: Food Processing, Industrial Processing

Description

In this project a X T/Hr steam boiler installed in XX was removed and a new 20 T/hr steam boiler and associated equipment to generate 13 BarG steam was installed. The project improve the boiler house efficiency and reliability.

The works were completed without interruption to the site steam supply.

Project Elements

  • Pipework Design
  • Equipment Specification

Back to projects

Services Provided

  • Design Report
  • Tender & Construction Pack
  • Procurement
  • Project Management & PSDP
  • Integration with Site Systems
  • Commissioning