Boortmalt Wastewater Treatment Plant Upgrade

Areas of work: Water

Description

Boortmalt’s planned 30% production expansion at its Athy facility required a significant upgrade of the existing WWTP. Working within a highly constrained footprint, including a listed building, Fingleton White carried out front-end engineering design, option assessment and procurement support to identify the most practical and future-proof upgrade solution.

Project Elements

  • WWTP capacity expansion assessment
  • 3D laser scan and site surveys
  • Process and MEICA design
  • MBR and denitrification evaluations
  • Odour management solutions
  • Tender preparation and procurement support

Back to projects

Services Provided:

  • Front-End Engineering Design (FEED)
  • WWTP Assessment & Option Studies
  • Site Surveys & 3D Laser Scanning
  • Process & MEICA Design
  • Tender Documentation Preparation
  • Procurement Management & Tender Evaluation
  • Bidder Site Survey Coordination
  • Costed Options & Upgrade Recommendations