Echelon AGI
Areas of work: Gas Infrastructure

Description
An 85 barg 200NB pipeline was required to supply gas from an existing transmission pipeline to a new above ground installation (AGI) to feed a new customer on the gas network in Ireland. The pipeline was routed through an urban area and crossed below the grand canal via trenchless crossing.
Project Elements
- 1.5km 200 NB diameter pipeline
- Hot tap from existing 450 NB mains
- Trenchless Crossing below the Grand Canal via micro tunneling
- Above ground installation- Filter & metering skid