Rapid Gravity Filter & Sludge Treatment Upgrade

Areas of work: Water

Description

Upgrade scheme to the 30 MLD BEWL WTW, which consists of 12 work packages. Delivering the detailed design on upgrades to the existing Rapid Gravity Filter (RGF) and the newly built sludge treatment works. The project increased the treated water capacity of the works to 23.7 MLD and involved complex brownfield modifications undertaken within a live operational environment. Fingleton White was responsible for the design and delivery of the RGF and Sludge Treatment upgrades, improving operational performance, process resilience, monitoring capability, and maintainability across the site.

Project Elements

  • Hydraulic linking of the existing Dirty Washwater Tanks
  • Installation of two new polymer dosing systems & WRc-type sludge thickeners
  • Design and installation of a new sludge holding tank
  • Design of new building for MCC, polymer storage and makeup, sludge dewatering & storage
  • Installation of two new centrifuges for sludge dewatering 
  • Chlorine Dosing Studies & HVAC Design
  • Fencing & Lighting

Back to projects
  • Process Design
  • Detailed Design
  • ICA Design & Integration
  • Brownfield Design Coordination
  • RGF Upgrades
  • Sludge Treatment Design
  • Construction Support
  • Commissioning Support